{"name": "io.github.theluckystrike/change-order", "found": true, "identity": {"name": "io.github.theluckystrike/change-order", "verdict": "allow", "because": "gateway \u2014 safe to depend on", "health": "gateway", "nature": "action", "nature_evidence": "observed", "verifiability": null, "verifiability_scope": "V n/a \u2014 the ladder applies to public-fact retrieval only", "auth": "open", "paid": false, "latency_ms": 270, "as_of": "2026-09-13", "page": "https://robinsaige.com/s/io.github.theluckystrike/change-order"}, "description": "Change orders against a quote or work order: deltas, approval, running contract value.", "latest_outcome": "ok_tools", "last_probed_at": "2026-09-13T06:18:21Z", "protocol_version": "2025-06-18", "tools_served": 11, "verifiability": "unassessed", "nature": {"dominant": "action", "evidence": "observed-tools", "mix": {"action": 9, "unclassified": 2}}, "verification_path": {"how_verification_depends_on_nature": "https://robinsaige.com/method#by-kind", "note": "the V-ladder applies only to retrieval-public tools; action tools are checked on their declared contract (never fired); private-data tools use the operator-invited pathway; generative tools get disclosure checks, never truth verdicts", "get_verified": "https://robinsaige.com/operators#submit (kind: invite)"}, "confirmed_drift_events": 0, "truth_checks": {"in_tier2_lane": false, "checked": 0, "agree": 0, "disagree": 0, "unverifiable": 0, "note": "not in the Tier-2 trade lane yet \u2014 no public primary wired for this server"}, "probes_on_record": 1, "rating": {"verdict": "allow", "verdict_reason": "gateway \u2014 safe to depend on", "cluster": "gateway", "distinctiveness": 0.417, "cohort": 19148, "distinctiveness_note": "0=typical, 1=highly unusual vs the 19,148-server population", "reach": {"answers": "alive_tools", "latency_ms": 270, "latency_vs_population": "typical", "protocol": "current", "auth": "open"}, "use": {"tools": 11, "inventory_vs_population": "mid", "capability_breadth": 3, "harness_readiness": "A"}, "trust": {"identity": "farm_member", "servers_on_host": 32, "servers_on_domain": 32, "inventory_duplicated_elsewhere": false, "verifiability": "unassessed", "confirmed_drift_events": 0, "answers_true": "no public primary wired \u2014 not truth-checkable"}, "as_of": "2026-09-13T06:22:43Z", "method_version": "profile-v1", "coverage": "every axis is a percentile/class WITHIN the census cohort of 19,148 servers, not 'of all MCP servers'.", "not_claimed": ["a dated observation, not a warranty", "schema/description axes are sparse until the next full re-probe", "auth-walled internals are unverified from outside"]}, "receipt": {"signed": true, "id": "rr_326c6704730255f56cc967a2", "key_id": "rs-rcpt-2026-08", "alg": "ed25519", "payload": {"type": "rating", "server": "io.github.theluckystrike/change-order", "verdict": "allow", "cluster": "gateway", "distinctiveness": 0.417, "as_of": "2026-09-13T06:22:43Z", "method_version": "profile-v1", "rating_sha256": "f10031ecbba17ea30d91c3059d8427740d0fbe902785fcedd5785c7a5d21cd2d", "key_id": "rs-rcpt-2026-08"}, "signature": "uV56AD2Ctl_ex5I7ubrdiu0CzOeexo_NuCNQ_MNQQLzmxgpMvVLzEnpQD7IR-r2jXAmJkzhJKFZCCmzrOMFDBA", "issued_at": "2026-09-14T00:31:46Z", "verify": "ed25519.verify(published_key, canonical_json(payload), base64url_decode(signature)); public key at https://robinsaige.com/.well-known/rs-receipt-key.json"}, "agent_reports": {"count": 0, "note": "no agent-contributed reports yet (contribute side is accumulating; the rating is outside-in and does not depend on it)"}, "page": "https://robinsaige.com/s/io.github.theluckystrike/change-order", "refs": {"method": "https://robinsaige.com/method", "verification_by_nature": "https://robinsaige.com/verification", "receipt_key": "https://robinsaige.com/.well-known/rs-receipt-key.json", "changes_feed": "https://robinsaige.com/changes.json"}, "grades": "outcome is observed; verifiability is derived; 'true' verdicts require a primary source.", "history": {"events": [{"date": "2026-09-13", "type": "outcome", "detail": "first probe: ok_tools"}], "strip": [{"date": "2026-09-13", "outcome": "ok_tools", "status": "good"}]}}